Piping Insulation

Before PIPING INSULATION 1

Before

Before PIPING INSULATION 2

Before

After PIPING INSULATION 3

After

After PIPING INSULATION 4

After

After PIPING INSULATION 5

After

After PIPING INSULATION 6

After

After PIPING INSULATION 7

After

Re-painting to Sweating corroded surface piping by special paint application method prior to insulate.

Feed Gas Pipeline operating under the temperature of 5oC insulated with PIR pipe section ( fire retardant grade required for Petrochemical and Gas plant industrial ) and finished with aluminum cladding. A new innovation system of elbow insulation by 2 pieces PIR elbow sections. With this system you can rely of a better thermal efficiency as the joints are reduced over 75% thus will prevent a condensation consequent to a cost saving due to renewal of insulation.

WINTHERMS offer a complete package solution of renovation including design an adequate insulation system and thermal calculation.